Installation of equipment for charging electric vehicles begins at gas station

Installation of equipment for charging electric vehicles begins at gas station

17 6月 2021 0000

June 17, Fineko/abc.az. The installation of equipment for charging electric vehicles has begun at SOCAR gas stations.

ABC.AZ reports that this equipment was installed for the first time on the Salyan highway, on the territory of the ‘SOCAR’ gas station, near the Bibi-Eibat mosque.

By the end of this year SOCAR chargers will be installed and put into operation to consumers throughout the Absheron Peninsula, as well as in Siyazan, Gusar, Shamakhi, Sheki, Geran, Hajigabul, Gobustan, Salyan, Lerik, and Shusha.


普通合伙人

赞助商

媒体支持

展览开始:

小时

最小